HyreSolar

Solar services

Rooftop Solar

Rooftop solar is the default because the structure already exists and the roof is usually the sunniest surface you own. What decides whether it works well is not the panels, it is the roof: how many unbroken planes you have, which way they face, what they are covered in, and how many years they have left.

In short

  • Usable plane area matters more than total roof area. Vents, chimneys and valleys break a roof into small pieces.
  • Orientation shifts when you produce, not just how much. South maximises the annual total; west shifts output into the expensive evening.
  • Roof material changes the labour cost and the leak risk. Asphalt shingle is the easy case; tile and slate are not.
  • Every attachment is a hole in a waterproof surface. Flashing quality is the whole ballgame on leaks.
  • A roof with under ten years left should be replaced first — the alternative is paying to remove and reset the array later.

Last reviewed HyreSolar does not install or service solar systems

Usable area, not roof area

A designer does not care how big your roof is. They care how many rectangles they can fit on it.

Plumbing vents, chimneys, skylights, dormers, hips and valleys all break a plane into fragments, and fire codes require clear setbacks at ridges and eaves for roof access. A large, complicated roof can yield less usable area than a small plain one.

This is why two houses on the same street get very different proposals.

Orientation changes when, not only how much

In the northern hemisphere a south-facing plane produces the most over a year. That is the familiar rule, and it is incomplete.

  • South. Highest annual total. Best when you are paid a flat rate for everything you produce.
  • West. Lower annual total, but output shifts into the late afternoon and evening. Under a time-of-use tariff that is when electricity is most expensive, so west can be worth more per kilowatt-hour.
  • East. Morning-weighted. Useful for households with a morning load, and for pairing with a battery that then carries the evening.
  • North. Rarely worth it in the US unless the pitch is very shallow.

Pitch, and the flat-roof exception

Most residential pitches between roughly 15 and 40 degrees are fine, and the difference between them is smaller than people expect.

Low-slope and flat roofs are a different job. Panels are usually tilted on frames, which means spacing rows so they do not shade each other, which means fitting fewer panels than the raw area suggests. Flat roofs also shed dirt and snow poorly, so soiling matters more.

Roof material decides the labour

Asphalt shingle is the straightforward case and most US racking is designed around it.

Tile is slower: tiles must be lifted, sometimes cut, and specific flashings used, and breakage is normal and should be priced in. Slate is slower still and unforgiving of foot traffic. Standing-seam metal is the outlier in the good direction, because clamps grip the seam and the roof is never penetrated at all.

Ask which flashing system is being used by name, and how many penetrations the design makes.

How the work runs

  1. Plane inventoryEvery usable rectangle measured, with setbacks and obstructions removed. This is the real constraint on system size.
  2. Shade measurementMeasured across the year, not judged by eye on the day of the visit.
  3. Structural checkThat the framing takes the added dead load, especially on older or long-span roofs.
  4. Attachment and flashing designWhere the holes go, and what keeps water out of them for twenty-five years.
  5. LayoutPanels placed to fill planes efficiently while respecting fire setbacks and access paths.

What moves the price

We do not publish a national average and present it as your price. These are the variables that separate two quotes for the same job — run your own numbers with the cost guides and calculators, and check what incentives you actually qualify for.

FactorWhy it moves the number
Number of separate planesEach plane needs its own rails and often its own wiring run. Four small planes cost more than one large one for the same panel count.
Roof coveringTile and slate carry real labour premiums. Standing-seam metal can be cheaper because it needs no penetrations.
Pitch and heightSteep or two-storey work needs more fall protection and slows everything down.
Obstruction densityVents and skylights that have to be worked around, or occasionally relocated.
Remaining roof lifeNot a line item, but the largest hidden cost if it is ignored.

What to ask before you commit

Take this list to the conversation. A professional who answers these directly is telling you a lot; one who deflects is telling you more.

  • How much usable plane area did you find, and where?
  • Which flashing system are you using, by name?
  • How many roof penetrations does this design make?
  • What did you measure the shade with, and across what period?
  • What is the remaining life of my roof covering, in your assessment?

Common questions

Does my roof have to face south?

No. South gives the highest annual production, but west-facing arrays shift output into the late afternoon, which is worth more under a time-of-use tariff. East suits morning loads. North is rarely worth it.

Can solar be installed on a tile roof?

Yes, with tile-specific flashings and more labour. Some tile breakage during installation is normal and should be discussed and priced before work starts.

Will panels damage my roof or cause leaks?

A correctly flashed penetration should not leak for the life of the roof. Leaks around solar are almost always a flashing workmanship problem, which is why the workmanship warranty and who holds it matter.

How many panels will fit on my roof?

It depends on usable plane area after setbacks and obstructions, not total roof area. A complicated large roof often fits fewer panels than a plain smaller one.

Solar services

Other kinds of solar work

Solar panel installation

A residential solar installation is mostly paperwork.

Home battery storage

A home battery stores electricity for later.

Solar + storage

Solar plus storage is not solar with a battery bolted on.

Solar panel repair

Most solar systems that appear broken are not broken in the way the owner assumes.

EV charger installation

Installing a home EV charger is an electrical job, not a solar job.

Solar panel cleaning

For most homes in most climates, paying someone to clean solar panels does not return what it costs.

Panel removal and reinstall

Removal and reinstall — usually called R&R — is taking a working array off, storing it, and putting it back.

Solar water heating

Solar water heating uses roof collectors to heat water directly, rather than generating electricity.

Commercial solar

Almost nothing on the rest of this site transfers cleanly to a commercial project.

Ground-mount solar

A ground mount puts the array on a frame in your yard instead of on your roof.

Solar carports

A solar carport is a structure built to hold panels that happens to shelter a car underneath.

Off-grid solar

Off-grid means no utility connection at all: your system is the only source of power, so it must cover the worst week of the year, not the average one.

Solar + roof replacement

If your roof has under about ten years of life left, replace it before the array goes on.

Solar monitoring

Monitoring is the only way you find out a system has stopped producing properly.

Adding panels

Adding panels is rarely as simple as bolting more modules to the roof.

System upgrades

Most solar systems need one significant intervention during their life, and it is usually the inverter.